Deliverables

5.1.1.1 Required Deliverables

The Owner Project Requirements (OPR) shall identify all deliverables required by the Standard for Project BIM Requirements.

5.1.1.2 BIM Quality Plan

A BIM Quality Plan shall be documented in the Project BEP and could be incorporated or referenced in a Project Quality Plan. The OPR shall define when the BIM Quality Plan should be delivered and by which delivery team member(s). See: BIM Quality Plan

5.1.1.3 Security Plan Deliverable

If a Security Plan is not being provided to the delivery team member, then the OPR shall define when the Security Plan should be delivered and by which delivery team member(s) it should be delivered. See: Security

5.1.1.4 BIM Execution Plan (BEP) Deliverables

The OPR shall define when a Project BEP should be delivered and which delivery team member(s)should be involved in the development and delivery of the BEP (see BIM Execution Plan Module for details).

5.1.1.5 Model Deliverable(s)

The OPR shall specify the deliverable format for each BIM Use. For each Model Deliverable, the owner shall provide a Model Requirement (See: Model Requirements) expectation.

5.1.1.6 Data Deliverable(s)

The OPR shall specify the delivery format for any required data deliverable. Each data deliverable shall be delivered using either an industry standard format (e.g., COBie) or a format defined by the owner. (See: Data Requirements)

National BIM Standard-United States® (NBIMS-US™) Version 4

The NBIMS-US™ v4 is a consensus-based national-level standard focused on defining standard approaches and guidelines to defining requirements, planning BIM adoption, and exchanging information between project team members. MORE