Skip to main content
Project BIM Requirements

5.3.3
Modeling Requirements (Creation Requirements)

5.3.3.1 Owner Specific Requirements

If the owner has specific modeling requirements, the OPR shall indicate the Delivery Teams requirement to use them. These requirements shall include but are not limited to: Model Tolerances and Dimensioning, Structure of the Model, Naming conventions, Coordinate Systems, Linking and Referencing Procedures, Model Views, Data Schema (e.g. Shared Parameters, Item Types, etc.).

National BIM Standard-United States® (NBIMS-US™) Version 4

The NBIMS-US™ v4 is a consensus-based national-level standard focused on defining standard approaches and guidelines to defining requirements, planning BIM adoption, and exchanging information between project team members. MORE