Controls may have assignments indicating objects that must observe the established requirements. An example of such assignment is a labor resource assigned to a calendar.
Figure 41 illustrates an instance diagram.
![]() |
Figure 41 — Control Assignment |
Entity | ![]() |
![]() |
![]() |
![]() |
---|---|---|---|---|
IfcCostItem | - - |
R R |
- - |
R R |
IfcProjectOrder | - - |
- - |
- - |
- - |
IfcWorkSchedule | - - |
- - |
- - |
O O |