PDX Airport | Mar 19 2021 – Mar 26 2021
Oregon could experience a magnitude-8.7 or larger earthquake within 50 years that causes catastrophic deaths and damage. Portland International Airport (PDX) can play a crucial role speeding the response and recovery and prevent much of the harm…
NIBS BIM Council | Mar 15 2021
The National Institute of Building Sciences (NIBS) proposes to lead the development and dissemination of a next-generation information standard for the built environment. The U.S. National Building Information Management Program will build on the work of the NIBS BIM Council…
Avenue M Group, LLC | Mar 1 2021 – May 31 2021 In December 2020, the National Institute of Building Services (NIBS) held a social equity roundtable with over two dozen organizations representing the built environment…
FEMA | Dec 1 2019
The Natural Hazard Mitigation Saves: 2019 Report represents the most exhaustive benefit-cost analysis of natural hazard mitigation, from adopting up-to-date building codes and exceeding codes…
U.S. FHWA Office of Bridges and Structures | Apr 1 2016 IFC Bridge Design to Construction Information Exchange (U.S.) was developed under contract to the U.S. Federal Highway Administration by the National Institute of Building Sciences…
U.S. Department of Homeland Security | Apr 1 2015 The Department of Homeland Security (DHS) has national leadership responsibilities for managing risks involving critical infrastructure…
AIA, CSI and NIBS | Apr 1 2013 – Sep 30 2016 The NCS is a consensus standard incorporating industry publications. It is comprised of interrelated standards, guidelines and tools for uniformly organizing and presenting facility drawing information…
National Institute of Building Sciences | May 12 2012 The National BIM Standard-United States™ (NBIMS-US™) provides consensus-based standards through referencing existing standards, documenting information exchanges and delivering best business practices…
Fannie Mae Stemming from extensive mitigation research, the National Institute of Building Sciences is working with Fannie Mae to develop a roadmap on mitigation investment to help Americans and the nation’s built environment prepare for and better respond to the devastating effects of climate change.
Avenue M Group, LLC | Mar 1 2021 – May 31 2021 In December 2020, the National Institute of Building Services (NIBS) held a social equity roundtable with over two dozen organizations representing the built environment…
U.S. Department of Homeland Security | Apr 1 2015 The Department of Homeland Security (DHS) has national leadership responsibilities for managing risks involving critical infrastructure…
U.S. FHWA Office of Bridges and Structures | Apr 1 2016 IFC Bridge Design to Construction Information Exchange (U.S.) was developed under contract to the U.S. Federal Highway Administration by the National Institute of Building Sciences…
Fannie Mae Stemming from extensive mitigation research, the National Institute of Building Sciences is working with Fannie Mae to develop a roadmap on mitigation investment to help Americans and the nation’s built environment prepare for and better respond to the devastating effects of climate change.
PDX Airport | Mar 19 2021 – Mar 26 2021
Oregon could experience a magnitude-8.7 or larger earthquake within 50 years that causes catastrophic deaths and damage. Portland International Airport (PDX) can play a crucial role speeding the response and recovery and prevent much of the harm…
National Institute of Building Sciences | May 12 2012 The National BIM Standard-United States™ (NBIMS-US™) provides consensus-based standards through referencing existing standards, documenting information exchanges and delivering best business practices…
FEMA | Dec 1 2019
The Natural Hazard Mitigation Saves: 2019 Report represents the most exhaustive benefit-cost analysis of natural hazard mitigation, from adopting up-to-date building codes and exceeding codes…
NIBS BIM Council | Mar 15 2021
The National Institute of Building Sciences (NIBS) proposes to lead the development and dissemination of a next-generation information standard for the built environment. The U.S. National Building Information Management Program will build on the work of the NIBS BIM Council…
AIA, CSI and NIBS | Apr 1 2013 – Sep 30 2016 The NCS is a consensus standard incorporating industry publications. It is comprised of interrelated standards, guidelines and tools for uniformly organizing and presenting facility drawing information…